Roofing
1.
Roofing: Material Application ( R-1 )
2.
Roofing: General Concrete Crack and Joint Treatment ( R-2 )
3.
Roofing: Concrete Construction Joints ( R-3 )
4.
Roofing: Precast Concrete Plank/Panel Joint Treatment ( R-4A )
5.
Roofing: Precast Plank Deck w/Top Slab for Standard 180 Mil Assembly ( R-4B )
6.
Roofing: Alternate Substrate Applications ( R-5A )
7.
Roofing: Alternate Substrate Applications ( R-5B )
8.
Roofing: Expansion Joint Up To 1" As-Built Widths ( R-6A )
9.
Roofing: Field Expansion Joint 1"-2" Max. As-Built Width ( R-6B )
10.
Roofing: Alternate Prefabricated Field Expansion Joints ( R-6C )
11.
Roofing: Deck-To-Wall Expansion Joint 1"-2" Max. As-Built Widths ( R-6D )
12.
Roofing: Alternate Prefabricated Deck To Wall Expansion Joints ( R-6E )
13.
Roofing: Typical Conduit Penetration & Pitch Pocket ( R-7A )
14.
Roofing: Typical Round Penetrations (Pipe, Vent, etc.) ( R-7B )
15.
Roofing: Typical Round Penetration eith HydroSeal (Pipe, Vent, etc.) ( R-7C )
16.
Roofing: Typical Photovoltaic Panel Rack Installation Options ( R-7D )
17.
Roofing: Typical Drain Details ( R-8A )
18.
Roofing: Typical Drain Details ( R-8B )
19.
Roofing: Typical Curb Details ( R-9 )
20.
Roofing: Typical Curb Detail with HydroSeal (R-9B)
21.
Roofing: Round Shape Penetration with Base Plate ( R-10A )
22.
Roofing: Irregular Shape Penetration Cast into Deck ( R-10C )
23.
Roofing: Irregular Shape Penetration with Base Plate ( R-10B )
24.
Roofing: Complex Clustered Irregular Shaped Penetrations ( R-10D )
25.
Roofing: Pre-Flashing with Hydroseal Resin Liquid Flashing ( R-10E )
26.
Roofing: Typical Parapet - Covered Flashing Conditions ( R-11A )
27.
Roofing: Typical Parapet - Exposed Flashing Conditions ( R-11B )
28.
Roofing: Typical Parapet - Gypsum Board/Metal Deck Substrate ( R-11C )
29.
Roofing: Typical Parapet - At Precast Wall ( R-11D )
30.
Roofing: Typical Parapet - At Precast Wall ( R-11E )
31.
Roofing: Alternate Flashing Corner Transitions ( R-12 )
32.
Roofing: Alternate Flashing Terminations ( R-13 )
33.
Roofing: Roof Edge Termination - Typical Gravel/Paver Stop ( R-14 )
34.
Roofing: Thru-Wall Scupper Flashing ( R-15A )
35.
Roofing: Overflow Scupper Flashing ( R-15B )
36.
Roofing: Inside Corner Reinforcement ( R-16A )
37.
Roofing: Outside Corner Reinforcement ( R-16B )
38.
Roofing: Typical Tie-In Details (Curbed) ( R-17A )
39.
Roofing: Typical Tie-In Details (Horizontal) ( R-17B )
40.
Roofing: Typical Tie-In Details (Thru-Wall/Air Barrierl) ( R-17C )