Applications
1.
PIP Bordered By Concrete (Preferred New Construction)
2.
1/2" PIP Wear Course Over Concrete / Asphalt (No Attenuation)
3.
Above Grade PIP Install – Concrete / Asphalt
4.
Synthetic to PIP Edge
5.
Flush Mount to Wall
6.
Flush Mount to Wall New Construction
7.
Turndown Into Sand
8.
Turndown into Sand New Construction
9.
Seam Transition
10.
Installation at Equipment Edge
11.
Tapered Edge With Keyway
12.
Resilient Surface Mound Detail
13.
Poured-in-Place Safety Surface Mound Detail
14.
Standard Pour in Place