Product Profile

Water-Resistive and Air Barrier System (DensElement™ System)


CAD Drawings BIM Models Georgia-Pacific Gypsum Water-Resistive and Air Barrier System (DensElement™ System)
The DensElement™ System is a new, all-in-one, water-resistive and air barrier (WRB-AB) system solution that completely eliminates an additional WRB over the face of the sheathing in commercial construction. The enhanced, fiberglass mat sheathing panel integrates a WRB0AB directly within its core, which offers high vapor permeability. In combination with a GP-approved liquid flashing, this allows the exterior wall cavity to dry if moisture is introduced and helps prevent potential mildew, mold and deterioration. 

Pre-assembled Collections CLICK ON THE LISTING BELOW TO DOWNLOAD FILES Back To Top

CAD
3D
Specs
About
Media
Education
PrintCAD
Close
1
Wall Seam
Close
2
Corner - Inside/Outside Wall
Close
3
Penetrations - Pipe and Mechanical
Close
4
Opening, Rough with Window Bucks - on Sheathing Wall
Close
5
Window Flange, Sealing
Close
6
No Flange - Window Flashing
Close
7
Transition, Roof to Wall - Wall Face
Close
8
Transition, Roof to Wall - Wall Cap to Roof
Close
9
1-hour Control Joint, Wood-Framed
Close
10
1-hour Control Joint, Steel-Framed
Close
11
2-hour Control Joint, Wood-Framed
Close
12
2-hour Control Joint, Steel-Framed
Close
13
Termination at Grade - Stucco
Close
14
Deflection Joint
Close
15
Deflection Joint-Greater Than 1"
Close
16
Opening, Rough - Integration w/ Building Wrap-Asphalt Felt (WRB)
Close
17
Steel Framed Barrier System - 2 hour
Close
18
Wood Framed Barrier System - 2 hour

All Available 2D CAD Files Back To Top

CAD Drawings Georgia-Pacific Gypsum Steel Framed Barrier System - 2 hour
Steel Framed Barrier System - 2 hour
View CAD
CAD Drawings Georgia-Pacific Gypsum Wood Framed Barrier System - 2 hour
Wood Framed Barrier System - 2 hour
View CAD

All Available BIM and 3D Files Back To Top

Wall Seam
View 3D
BIM Models Georgia-Pacific Gypsum Corner - Inside/Outside Wall
Corner - Inside/Outside Wall
View 3D
Penetrations - Pipe and Mechanical
View 3D
Opening, Rough with Window Bucks - on...
View 3D
Window Flange, Sealing
View 3D
No Flange - Window Flashing
View 3D
Transition, Roof to Wall - Wall Face
View 3D
Transition, Roof to Wall - Wall Cap to...
View 3D
1-hour Control Joint, Wood-Framed
View 3D
1-hour Control Joint, Steel-Framed
View 3D
2-hour Control Joint, Wood-Framed
View 3D
2-hour Control Joint, Steel-Framed
View 3D
Termination at Grade - Stucco
View 3D
Deflection Joint
View 3D
Deflection Joint-Greater Than 1"
View 3D
Opening, Rough - Integration w/...
View 3D
Steel Framed Barrier System - 2 hour
View 3D
Wood Framed Barrier System - 2 hour
View 3D