The Pentagon
Washington, DC

Project Details

Download
Location
Washington, DC

Corro-Shield was selected by the Pentagon after the 9/11 attack because we were the only company with a quick solution for green concrete covering. The contractor commissioned to rebuild the affected area had a mandate to rebuild the Pentagon as fast as possible.

Traditional epoxy flooring requires that newly poured concrete go through a 28 day setting time. Our solution requires only 24 hours.

We enabled the re-construction of the Pentagon to happen in a timely manner.

This was truly special to us.