GT IMPAX
1.
Synthetic To Pip Edge
2.
Sub Base Site Prep
3.
½’ Pip Wear Course Over Concrete / Asphalt ( No Attenuation )
4.
PIP Bordered By Concrete ( Preferred New Construction )
5.
Above Grade Pip Install - Concrete / Asphalt
6.
Flush Mount To Wall, Curb, Or Sidewalk ( Existing Construction )
7.
Post / Pole Edge Pip Installation
8.
½" Pip Over Concrete / Asphalt ( Rolled Edge At Fence / Perimeter )
9.
Pip Step Seam ( Color / Design Work )
10.
½" Wear Course Over Concrete or Asphalt
11.
Resilient Surface Mound Detail
12.
LFG16 – 6.5” System: Field Detail
13.
LFG16 – 6.5” System: Edge Detail
14.
Poured-in-Place Safety Surface Mound Detail