SurfaceMax
1.
Sub Base Site Prep
2.
½’ Pip Wear Course Over Concrete / Asphalt ( No Attenuation )
3.
PIP Bordered By Concrete ( Preferred New Construction )
4.
Above Grade Pip Install - Concrete / Asphalt
5.
Flush Mount To Wall, Curb, Or Sidewalk ( Existing Construction )
6.
Post / Pole Edge Pip Installation
7.
½" Pip Over Concrete / Asphalt ( Rolled Edge At Fence / Perimeter )
8.
Pip Step Seam ( Color / Design Work )
9.
½" Wear Course Over Concrete or Asphalt
10.
Poured-in-Place Safety Surface Mound Detail
11.
Resilient Surface Mound Detail
12.
LFG16 – 6.5” System: Edge Detail
13.
LFG16 – 6.5” System: Field Detail