1.
½’ Pip Wear Course Over Concrete / Asphalt ( No Attenuation )
2.
Above Grade Pip Install - Concrete / Asphalt
3.
Flush Mount To Wall, Curb, Or Sidewalk ( Existing Construction )
4.
Post / Pole Edge Pip Installation
5.
½" Pip Over Concrete / Asphalt ( Rolled Edge At Fence / Perimeter )
6.
Pip Step Seam ( Color / Design Work )
7.
½" Wear Course Over Concrete or Asphalt
8.
45 Degree Turn Down To Loose Fill Material
9.
Synthetic To Pip Edge
10.
PIP Bordered By Concrete ( Preferred New Construction )
11.
Resilient Surface Mound Detail
12.
Poured-in-Place Safety Surface Mound Detail