Euclid Chemical

Tucson Convention Center

Project Details

The repair and rennovation of the Tuscon Convention Center’s eight bathrooms and breezeway utilized a combination of Metal FX, Euco QWIKstitch, Single Component Spray Deck Grout and WB Urethane, and offered a durable and decorative repair solution for the Center’s 42-year-old, original concrete. Metal FX was chosen for its stunning and unique reflective look as well as its tough, abrasion resistant surface that is able to withstand years of use and abuse. A blend of 2 parts charcoal and 1 part pearl Metal FX created a stain proof, custom decorative solution that was also easy to apply. Increte’s high performance epoxy, ensures Metal FX is easy to clean and stands up to harsh chemicals. Because the Convention Center, home to the University of Arizona’s ice hockey team, WWE matches, concerts and more, needed to remain open while renovations were made, Euco QWIKstitch’s fast cure time was a perfect fit. Floors repaired
with Euco QWIKstitch, which is used to mend cracks in concrete, repair spalled joints and patch damaged or uneven concrete surfaces, can be opened to foot traffic in just 10 minutes and are ready for heavy traffic in one hour.

Products and Design Files

Project Resource Files

Video Library