Chameleon Ways

Yale University - Baker Hall
New Haven, CT

Project Details

Location
New Haven, CT
Project Year
2018

This area of the campus required a highly permeable product because the surface it had 2 purposes; to act as a walkway surface for student traffic and to function as a drip edge for water runoff from the roof design. The Addapave being our most porous product was the right solution in its appearance and function.


CUSTOMER:

Yale University - Baker Hall

New Haven, CT


Installed:

August 2018


PROCESS:

Addapave — 6-10mm Brittany Bronze mix placed over compacted stone around some large pavers in place as a walkway. Though typically used for Tree Pits, the Addapave product is safe for pedestrian traffic and has a high porosity.

 

BENEFITS:

  • High Porosity
  • Natural Stone
  • Hard Wearing
  • Low Maintenance
  • Seamless

Products and Design Files

Project Resource Files

Resin Bounded and Resin Bound Brochure