Glenorchy Trail: Steep Slope Stabilization
Oakville, ON, CAN
Project Details
- Architect
- CSL Group / Amec Foster Wheeler
- Location
- Oakville, ON, CAN
- Project Year
- 2014
- Size
- 8100 Units / 450 m2
Project Snapshot
The subsurface of clay shale was eroding on this steep slope due to the scouring action of the adjacent Sixteen Mile Creek, which removed material from the slope walls, preventing the slope from reaching a stable inclination. Town officials were concerned their well used trail system would fail within the Glenorchy Conservation Area.
Reinforced Application
Envirolok, combined with mechanical connection to the slope provides stability and the ability to expedite construction to restore vegetative cover lost to erosion. A crane was used to access the slope across the creek and atop a 3m buttress to enable expedited construction. 125 x 3m grouted and threaded rebar anchors were first installed into the slope to which Envirolok was mechanically connected with geogrid.
Vegetation Approach
The project was hydroseeded immediately following construction with a Bonded Fibre Matrix containing native grass and wildflower seed and perennial rye cover crop. Following application, approximately 2000 dogwood and willow live stakes were inserted into the Envirolok structure.
Results
Excellent results with full vegetated cover achieved within 3 months of construction. Envirolok supplies a permanent vegetated solution to persistent erosion of slopes. Envirolok easily conforms to the natural contours of a slope compared to other systems. Envirolok also provides structural support that when combined with native vegetation allows the establishment of habitat along sensitive areas.
Vegetation Approach: The project was hydroseeded immediately following construction with a Bonded Fibre Matrix containing native seed and perennial rye cover crop. Following application, approximately 2000 dogwood and willow live stakes were inserted into the Envirolok™ structure.
Size of Project: Approx. 450m² constructed in 5.5 days.
Permanent Erosion Control
Envirolok’s patented system provides immediate stabilization, erosion control, and a permanent vegetated solution. Envirolok is adaptable to water or dry land sites.
Solution
Envirolok™ Results: Excellent results with full vegetated cover achieved within 3 months of construction.
Envirolok supplies a permanent vegetated solution to persistent erosion of slopes. Envirolok easily conforms to the natural contours of a slope compared to other systems. Envirolok also provides structural support that when combined with native vegetation allows the establishment of habitat along sensitive areas.
PROJECT PARTNERS
Engineer: AMEC Foster Wheeler
Contractor: CSL Group Ltd.
Bag Filler: Marco Clay Products Inc., Blandford-Blenheim, Ontario
Owner/Client – Town of Oakville
Approving Authority – Hamilton Conservation Authority